Armada Kraken

Owner: Bumi Armada
Type: FPSO

Armada Intrepid

Ower: Bumi Armada Berhad 
Type: FPSO
Period: December 2014 / May 2015

Terra Nova

Eigenaar: Petro-Canada (East Coast)
Type: Floating Production Storage and Offloading (FPSO)
Periode: July – September 2006

Petro-Canada (East Coast) awarded Keppel Verolme a contract for the turnaround of the Terra Nova FPSO in 2006. Keppel Verolme’s strategic location, facilities, resource availability, expertise, experience and excellence in project management and safety were key to clinching this challenging project. The unit arrived at the Keppel Verolme yard early July 2006. The scope of work included maintenance, inspection and modification of the hull and process topsides systems of the FPSO. The installation of an Additional Living Quarters (ALQ) aft of the existing accommodation increased the POB capacity of the vessel. Maintenance work involved the survey and overhaul of thrusters, maintenance of underwater valves, coating of the hull, and repair to the vessel and process systems. Inspection and modification works covered the testing of cargo tanks and pressure vessels and modifications in the process modules.

Sevan Voyageur

Eigenaar: Sevan Production AS
Type: Floating Production Storage and Offloading (FPSO)
Periode: November 2007 – November 2008

The Sevan Voyageur is the third FPSO unit that Keppel Verolme completed for the same owner. The world’s first cylindrical FPSO facility, Sevan Piranema, was completed in Keppel Verolme in January 2007. The second unit, Sevan Hummingbird, was delivered in the fourth quarter of 2007. The unit arrived in November 2007 as an empty steel hull built in China. Keppel Verolme's scope of work entailed the outfitting of marine and process equipment. Works included the installation of central shaft with pump modules, process modules and mechanical equipment, installation of piping, electrical, hydraulic and instrumentation systems, plus a complete outfitting of the accommodation block with HVAC and architectural works. The FPSO has an oil processing capacity of 30 000 bbls/day and a water injection capacity of 20 000 bbls/day.

Sevan Piranema

Eigenaar: Sevan Production AS
Type: Floating Production Storage and Offloading (FPSO)
Periode: May 2006 – January 2007

The innovative circular 300.000 bbls FPSO designed by Sevan Marine ASA was transported on a heavy lift cargo vessel from China to Rotterdam in May 2006 for final completion and installation of the topside process and marine equipment. Keppel Verolme's scope of work entailed the outfitting of marine and process equipment and final completion of all works. The contract included; receiving, temporary storing, pre-assembling and installation of process skids, pressure vessels piping and valves. Further work carried out included the fabrication and installation of steel structures and the hook-up of marine systems such as cranes and offloading station. The FPSO has a oil storage capacity of 300,000 barrels, an oil processing capacity of 30,000 barrels per day and a gas injection capacity of 3.6 million m³ per day.

Sevan Hummingbird

Eigenaar: Sevan Production AS
Type: Floating Production Storage and Offloading (FPSO)
Periode: April - November 2007

After the successful outfitting of the FPSO unit Sevan Piranema in 2006, Keppel Verolme received the second FPSO of Sevan Marine named Sevan Hummingbird. The unit arrived in April 2007 as an empty steel hull built in China. Keppel Verolme's scope of work entailed the outfitting of marine and process equipment. Works included the installation of central shaft with pump modules, process modules and mechanical equipment, installation of piping, electrical, hydraulic and instrumentation systems, plus a complete outfitting of the accommodation block with HVAC and architectural works. The FPSO has an oil processing capacity of 30 000 bbls/day and a water injection capacity of 20 000 bbls/day.

Aoka Mizu

Eigenaar: Bluewater Energy services
Type: FPSO
Periode: 2008/2009

Final completion before operation. Commissioning and assistance E&I systems.